“My first experience with Multitech was when we were the GC on a project at Piedmont Triad International Airport (PTIA) in Greensboro, NC. Multitech came in and took over the Baggage Handling System Installation from another company that abandoned the jobsite early on in the project. Multitech stepped in with very short notice and assisted us by producing the installation layouts and production drawings and performing the mechanical installation. They performed admirably and got the project back on schedule. Multitech, without a doubt, helped us turn a potentially disastrous project into a very successful project that was well received by all involved.
Multitech later assisted us again on another project at PTIA and again performed professionally and per the contract as a couple of years before.
Multitech’s managers and field crews were very cooperative and competent in all aspects of their scope of work on both projects. We look forward to the opportunity to work with them again on another project“
Todd Hodges
President
H. M. Kern Corporation
Greensboro, NC